(09-07-2021, 04:14 PM)Havana Wrote: [ -> ]If we're supposed to be as close to 32 days per stage as possible, and UMS Stage 2 takes 7 days per cycle, we're supposed to do 5 cycles, correct? 35 is closer than 28.
That depends on which month you're doing it in. 28 to 31 days in a month. I suggest that since this program is designed and intended to be cycled through multiple times anyway, it is better to finish the cycles before or on the last day of the month, and then start the next stage. This way you can get the results and keep easier track, and you won't have to worry about a subscription being necessary for an additional month just to listen for a few days if you are accessing it through a subscription.
This is how I am using it.
Stage 4 Shannon? Stage 4 is POWERFUL Man, very very POWERFUL. I'm running 4 loops a day( early evening) whew many many different sensations, deep sesnings,deep feelings adn definitely some very insight messages/stuff coming thru.
Also for the first time in a long long time I care hear voices at certain point thru the one..a Male voice,especially towards the end of the program. cant make out whats being said,but he's clearly there and I can hear him..then he dives deep.
UMSvs S4 is powerful. interestingly enough, if you press the # 4 key on your PC it prints a number 4,
if you press control and hit the 4 key it prints a dollar $ sign !! Ha!!
(09-07-2021, 08:15 PM)ncbeareatingman Wrote: [ -> ]Stage 4 Shannon? Stage 4 is POWERFUL Man, very very POWERFUL. I'm running 4 loops a day( early evening) whew many many different sensations, deep sesnings,deep feelings adn definitely some very insight messages/stuff coming thru.
Also for the first time in a long long time I care hear voices at certain point thru the one..a Male voice,especially towards the end of the program. cant make out whats being said,but he's clearly there and I can hear him..then he dives deep.
UMSvs S4 is powerful. interestingly enough, if you press the # 4 key on your PC it prints a number 4,
if you press control and hit the 4 key it prints a dollar $ sign !! Ha!!
Cool.
Please note that I just had someone ask me the best way to use UMS v2 in order to achieve the goals of the programs. The models clearly indicated that the best way is to use Stage 1, 2, and 3 for a month each and then use Stage 4 for two months before repeating the process.
Would a week or so off inbetween that be good? Not that i'm using UMS V2 yet but that was the first thing that popped into my head.
For people using UMS on the new store, how does the (monthly?) payment schedule line up with the recommendations for using the stages?
(09-07-2021, 10:39 PM)Benjamin Wrote: [ -> ]Would a week or so off inbetween that be good? Not that i'm using UMS V2 yet but that was the first thing that popped into my head.
That's not what came out of the models.
(09-08-2021, 05:34 AM)Ampersnd Wrote: [ -> ]For people using UMS on the new store, how does the (monthly?) payment schedule line up with the recommendations for using the stages?
I don't have the option of changing how many days a monthly subscription is for. Neither do I have much option for changing a stage ASRB2 cycle length. So the only way I can see to make it fit perfectly is to offer daily subscriptions.
(09-08-2021, 10:00 AM)Shannon Wrote: [ -> ] (09-08-2021, 05:34 AM)Ampersnd Wrote: [ -> ]For people using UMS on the new store, how does the (monthly?) payment schedule line up with the recommendations for using the stages?
I don't have the option of changing how many days a monthly subscription is for. Neither do I have much option for changing a stage ASRB2 cycle length. So the only way I can see to make it fit perfectly is to offer daily subscriptions.
What's the consequence of these imperfect subscription timelines (coming from someone who hasn't seen the dashboard)? Are you essentially signing on for 2 months if you play a stage for 32 days? If you run through one stage each month, are you given the remaining 28 days from the 2nd month as a credit (basically the second month has been unused with the subscription paused)?
(09-08-2021, 11:11 AM)Ampersnd Wrote: [ -> ] (09-08-2021, 10:00 AM)Shannon Wrote: [ -> ] (09-08-2021, 05:34 AM)Ampersnd Wrote: [ -> ]For people using UMS on the new store, how does the (monthly?) payment schedule line up with the recommendations for using the stages?
I don't have the option of changing how many days a monthly subscription is for. Neither do I have much option for changing a stage ASRB2 cycle length. So the only way I can see to make it fit perfectly is to offer daily subscriptions.
What's the consequence of these imperfect subscription timelines (coming from someone who hasn't seen the dashboard)? Are you essentially signing on for 2 months if you play a stage for 32 days? If you run through one stage each month, are you given the remaining 28 days from the 2nd month as a credit (basically the second month has been unused with the subscription paused)?
Like I said, the only solution I see is to offer daily subscriptions. Otherwise you can try to run it for as many ASRB2 cycles as possible but I have no way of crediting you some days of a month. The monthly subscription is all or nothing. I'll set up daily subscriptions and give you guys the power to switch to those, and we can do daily subscriptions instead of monthly from now on.
Why not bump the subscription period from 30 days to 40 or something like that.
(09-08-2021, 12:13 PM)Superman Wrote: [ -> ]Why not bump the subscription period from 30 days to 40 or something like that.
I have the option of doing X number of days, weeks, months or years. The closest I can come to that is daily subscriptions. Each different subscription option I create requires custom changes to the back end, apparently, and also a unique set of uploaded files. So as it turns out I can't even do daily subscriptions right now even if I want to because the guy working on the back end is busy moving from one country to another.
So for the time being... you have the option of Monthly, or Purchase. That's what I can do right now.
Hey Shannon are you going to put glossary and Faq pages back on shop website?
(09-08-2021, 01:52 PM)Z-Man Wrote: [ -> ]Hey Shannon are you going to put glossary and Faq pages back on shop website?
Glossary went up yesterday. I am still working on FAQ, but it's coming.
(09-08-2021, 12:05 PM)Shannon Wrote: [ -> ] (09-08-2021, 11:11 AM)Ampersnd Wrote: [ -> ] (09-08-2021, 10:00 AM)Shannon Wrote: [ -> ] (09-08-2021, 05:34 AM)Ampersnd Wrote: [ -> ]For people using UMS on the new store, how does the (monthly?) payment schedule line up with the recommendations for using the stages?
I don't have the option of changing how many days a monthly subscription is for. Neither do I have much option for changing a stage ASRB2 cycle length. So the only way I can see to make it fit perfectly is to offer daily subscriptions.
What's the consequence of these imperfect subscription timelines (coming from someone who hasn't seen the dashboard)? Are you essentially signing on for 2 months if you play a stage for 32 days? If you run through one stage each month, are you given the remaining 28 days from the 2nd month as a credit (basically the second month has been unused with the subscription paused)?
Like I said, the only solution I see is to offer daily subscriptions. Otherwise you can try to run it for as many ASRB2 cycles as possible but I have no way of crediting you some days of a month. The monthly subscription is all or nothing. I'll set up daily subscriptions and give you guys the power to switch to those, and we can do daily subscriptions instead of monthly from now on.
Thanks for the response, Shannon! I'll follow along with whatever you think works.