(07-26-2020, 02:40 PM)Benjamin Wrote: [ -> ] (07-26-2020, 01:07 PM)tolgaocal80 Wrote: [ -> ]Hi Shannon, What you think about AM7, do you have any estimated time to building it or I will contuine with OF ?
AM7 is likely quite a while off still, won't be until 6g and it won't be among the first few programs in it.
To give an update...
The plan previously was that 6G would have the first program be Absolute Self Confidence 6G, followed by a high end custom, followed by AM7.
The custom has been cancelled. Now the most likely outcome is ASC 6G, followed by AM7 being the first two programs in 6G.
I have a rough estimate how long it will take me to finish developing 6G, but even that is a rough estimate, dependant on variables I don't have pinned down. Before I am finished developing 6G I have the following to do,
at minimum:
1. Finish LTU6. (six stages)
2. Finish DMSI 3.3.3.
3. Finish UMS2. (six stages)
4. Develop, build and test Beast 19.
5. Mine the relevant data out of Beast 19, translate it to current skeleton script procedures and finish adding all new technologies to the 6G skeleton script.
6. Perform a complete audit of the entire skeleton script to upgrade and optimize all statements to the same level, and fine tooth comb it for any minor errors in scripting that may have slipped through while adding things from B19.
We are almost finished with scripting Stage 1 of Goal #1, but finishing the entire program will probably take me at least another 18 days.
Goal #2 will probably require 2-6 weeks. We'll say 4.
Goal #3 will probably require 2-4 weeks.
Goal #4 will probably require 2-3 months.
Goal #5 will probably require 1-2 months.
Goal #6 will probably require 1-3 months.
Now, if we ignore that I need to build new titles to keep the money coming in, and we assume I only take 1 day off a week, then we are looking at a
minimum of 3 days to finish scripting and building each of the 6 stages of LTU6 - 18 days; 2 weeks to get Goal 2 out; 2 weeks to get goal 3 out; 2 months for Goal 4; 1 month for Goal 5; and 1 month for Goal 6; that's a total of a minimum of a little over 5.5 months. If I take 1 day off per week, then we have to add at least 6 more days, making it 5.75 months. That's if I only do what's on the list, never have a non-productive day, never have to go over the minimum estimates and never build anything else that's on this list. In other words... pretty unlikely.
More likely is 9 to 15 months as a rough estimate. If we go with the median, we're probably looking at about a year.
You have time to do all 8 months of OF 5.75G.