06-09-2016, 03:23 AM
(06-08-2016, 03:35 PM)CatMan Wrote: EHPRA has become SOP for multi-stages. AM6 has it, as well as BASE 2.1. Future versions will have EHPRA 2.0 or whatever is most current, perhaps a tweaked version of EHPRA 3.0, depending on when they are built.
The reasons why most have issues getting massive results from multis generally boils down to fear. Even in the cases of AM6 and BASE 2.1, which include EHPRA 1.0. EHPRA 1.0, while being a great program, compared to EHPRA 2.0, doesn't do nearly as good of a job processing fears, or deep rooted issues. In the cases of multis like SM3 and WM2, who do not have EHPRA 1.0 even, the issue of garbage removal is even more difficult. SM3 has OGSF as well as AM6 and BASE 2.1, WM2 has OF as it's a bit older. Each will greatly benefit from the latest version of EHPRA when the time comes.
It's definitely not "too early" to validate 5.5G, it's validating itself if anything. If this is an indicator of the future with subs here, then the future is very bright, indeed.
I hope that helps you. Enjoy your E2 run, it should make some major changes for you.
Hey CatMan
Thank you. I meant sub such as single subs as well as the multi but your answer I think can be applied to any sub. I really hope now that this E2 version does the job of helping me so that not only I get moving on my life and not procrastinate or self sabotage but also that other subs work way better for me.
OF3 5.75.7G 13/15Vol
1L-2O/3OF; (1L-2/2 5/6); (2L 19/6); (3L 27/6); (4L 9/7); (H4L 25/7)
W 19 May
MLS 5.5G: ≈70days x2, IYGSH: 54, E2: 78+48, DMSI 3.2: 56 & 22, UMOP1: 57+UMOP2: 33 = 90+10 US v12/15=100, OF: 45, OF2: 56days
1L-2O/3OF; (1L-2/2 5/6); (2L 19/6); (3L 27/6); (4L 9/7); (H4L 25/7)
W 19 May
MLS 5.5G: ≈70days x2, IYGSH: 54, E2: 78+48, DMSI 3.2: 56 & 22, UMOP1: 57+UMOP2: 33 = 90+10 US v12/15=100, OF: 45, OF2: 56days