05-30-2021, 08:08 AM
For a few days now, my mind has been telling me to add an additional loop into the fray. So it would be 2 loops for Two days on and 3 days off.
Phase 1: The Foundation
AM6(2020)
LTU v6(2020-2021)
OF v3(2021)
Phase 2
AM6 Refresher + SM3(2021)
AM6(2020)
LTU v6(2020-2021)
OF v3(2021)
Phase 2
AM6 Refresher + SM3(2021)