(04-21-2021, 01:33 PM)Shannon Wrote: Alright, well I have it narrowed down to two or three options for what to build and release for this month. OF v3 is one, an aura program is one, and Stage 1 of UMS v2 is one. I will let the models decide, although OF v3 looked like it had a lead last I checked.
I just finished the took-forever step that usually takes a couple hours. I was forced to do that because of the drastic difference in format at 3+1 stage, with a drastic difference in the 5.75.7G, which essentially forced me to model which stage to put every one of the 126 modules in the key script into. Not a quick job. But it's done.
To answer the question of how long til UMS v2 is released, that's going to depend on whether I release it all at once or in stages (haven't decided that yet) and how long it takes me to build each stage. 5.75.7G is so new and different, I'm not sure how long each build will require. But it will definitely not be more than 2 months, and may be less than 1. We will see.
Now I'm working through how to configure 5.75.7G and Platinum Lake for the build.
but if you are to release UMSv2 and OFv3 at about the same time, this is making the choice extremely hard to make. I would probably eventually do both but I would do UMSv2 first.
I just need a little push to make my trading project take off for good. I feel like UMS could do it.
I'm prime to move on to another program... NSFM doesn't seem to manifest anything new for me... I'm not seeing anyone because of the lockdown!
I haven't written in my NSFM journal for many days. I have nothing to say!
It looks like that not doing the prescribed 4 months of usage is almost a sure thing...