Subliminal Talk

Full Version: Shannon's Journal, Volume 3
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
Work on upgrading the 6G-Alpha skeleton script to the 6G-Beta skeleton script is officially underway. Right now I'm in Phase 1, the optimization phase. There will also be Phase 2, during which I strip out everything that isn't necessary anymore. Once that's done, I'll be doing Phase 3, which is adding the final scripting additions that will make it into 6G.

I estimate this should require about 2 weeks to do. Once it's done, I'll start working on building the 6G-Beta test title, and then we'll start working on testing that. Testing is going to require between 1 and 3 months, depending on how this goes. I suspect it will probably be on the shorter end of that time frame.
The Optimus Engine being upgraded to v7.0, nice.
Made some HUGE changes to the 6G-Alpha Skeleton Script today to develop it into the 6G-Beta skeleton script. This is getting interesting.
I have determined that the volume of 4/15 on an Android cell phone through it's speakers, or 5/16 on an iPhone through it's speakers, or 8/30 on a Google phone with 30 clicks of volume, through it's speakers, is also very useful for SARM v2.1-B.