Day 58
Days completed = 40
Days missed = 18
Days required to complete 1 stage: 18 * 0.5 = 9 | 32 + 9 = 41
So tonight is my last night for stage 1 completion :exclamation:
Thoughts of the day:
Days completed = 40
Days missed = 18
Days required to complete 1 stage: 18 * 0.5 = 9 | 32 + 9 = 41
So tonight is my last night for stage 1 completion :exclamation:

Thoughts of the day:
- early this morning urge to shun friends and close off which is fairly normal for me, although I'm over reacting over much more trivial things to trigger this.
- Some thoughts and feelings to getting my shit together, training, eating healthier, focusing on study, career.
- Feels as if I'm just about to make some small break throughs, or at least on the very cusp!
NEW - Basic Speaker Setup for Subliminals - HERE
My EHPRA Journal - http://subliminal-talk.com/thread-5779.html
My Intro and Ramblings - http://subliminal-talk.com/thread-5785.html
My EHPRA Journal - http://subliminal-talk.com/thread-5779.html
My Intro and Ramblings - http://subliminal-talk.com/thread-5785.html