06-20-2017, 10:56 AM
(06-19-2017, 10:01 PM)Zane Wrote:(06-19-2017, 05:20 PM)Jake2015 Wrote:(06-19-2017, 12:23 PM)Zane Wrote:(06-19-2017, 11:54 AM)Jake2015 Wrote:(06-19-2017, 11:50 AM)Zane Wrote: P6 was supposed to make other P's work much better and make its more efficient and powerful.
Inshort it was supposed to make MLS-5.5G into MLS-5.6G.. Lool
lool thats amazing.
I can't wait for it, this procrastination is destroying me man.
Im sat watching youtube, or bouncing from website to website and also coming here rather than getting on with the work.
When I work I seem to be okay to focus but getting started is a nightmare.
More than that when i can work I can't seem to work for more than a total of 2hours (25mins study/work with 5-10mins break multiple times to reach 2hours) and thats not good either.
I need to work more when I have nothing else to do all day long and when I'm back at uni I need energy to come home and study and not be lazy and tired.
Think MLS 5.5G can work on any of this?
I am 100% it can work on this. You have more than enough time and energy to sit down and study for 2-3 hours straight(without any breaks). Thing is that when u sit down to study then ur minds starts jumping from one place to another and you use ur will to study but it's only a matter of time before before u give up... MLS-5.5G will fix this.. .. Your books will become like a drug to you. You won't be able to to live without learning. You will love and see that life is all about learning and gaining knowledge. It's all about NeuroGenesis.
I seriously can't wait for this!!!! how much more time do we have to wait for MLS 5.5G?
I guess 2-3 weeks.
I really hope so but since I just read you say MSL 5G didn't work on you then how long do you think it will take for MLS 5.5G to work on you?
OF3 5.75.7G 13/15Vol
1L-2O/3OF; (1L-2/2 5/6); (2L 19/6); (3L 27/6); (4L 9/7); (H4L 25/7)
W 19 May
MLS 5.5G: ≈70days x2, IYGSH: 54, E2: 78+48, DMSI 3.2: 56 & 22, UMOP1: 57+UMOP2: 33 = 90+10 US v12/15=100, OF: 45, OF2: 56days
1L-2O/3OF; (1L-2/2 5/6); (2L 19/6); (3L 27/6); (4L 9/7); (H4L 25/7)
W 19 May
MLS 5.5G: ≈70days x2, IYGSH: 54, E2: 78+48, DMSI 3.2: 56 & 22, UMOP1: 57+UMOP2: 33 = 90+10 US v12/15=100, OF: 45, OF2: 56days