09-07-2021, 04:44 PM
(09-07-2021, 04:14 PM)Havana Wrote: If we're supposed to be as close to 32 days per stage as possible, and UMS Stage 2 takes 7 days per cycle, we're supposed to do 5 cycles, correct? 35 is closer than 28.
That would really suck with a 30-day subscription
E3+DRS -> LTU6 -> IYE -> DRS -> LTU6 Refresher -> OF3