06-26-2020, 09:54 AM
(06-26-2020, 09:12 AM)Shannon Wrote:(06-26-2020, 07:23 AM)NOMAD Wrote:(06-25-2020, 12:01 PM)Griffin Wrote: @Shannon
When you have decided to either build UMS2 or LTU6 could you let us know?
if you build LTU and then DMSI and then UMS(which is the one I am waiting for) then I might buy OF, but since money is tight If you are building UMS first I will wait.
Thank you and please let us know when you have decided.
I second this request, although my vote for the next sub is LTU6.
If you determine that UMS2 is the next sub to be built, then DMSI after that, my estimation is that I would have 2-3 months to give OF 5.75/5.85? a decent run prior to LTU6 release. I realize that's not the 8 month stretch of time prescribed in the product description, but I'm intrigued at the results so far. I've been running LTU5 for over a year now and I theorize that shifting gears to focus on overall fear removal would unlock some of the dormant ground-level scripting that LTU5 has laid over time. As an extension of this, I suspect that OF 5.75/5.85? might be the better option leading up to LTU6 than continuing with LTU5.
Long story short, please let us know as soon as you determine what the next sub will be.
The models have advised me that in spite of the massive jump in power with OF, I should not transition to the 5.85G moniker yet. So we will be using 5.75G for the time being.
It also seems to be suggesting that LTU6 will be the better choice for first program built, which kind of surprises me. But that answer has not yet been verified.
You guys will know when I know.
Have you thought about how OF will work inside LTU6?
Will it "just" be in the form of FRM, or will it have a separate module, which I think would be amazing?