10-20-2016, 10:50 AM
DMSI 2.5 question:
I know we are to run 3 loops back to back per day as per the instructions. Does this mean only one loop set per 24 hrs or is there a minimum to wait between sets?
Thanks
I know we are to run 3 loops back to back per day as per the instructions. Does this mean only one loop set per 24 hrs or is there a minimum to wait between sets?
Thanks
~Hear ->Understand ->Execute ->Integrate~