06-22-2016, 02:23 PM
(06-22-2016, 02:20 PM)Shannon Wrote:(06-22-2016, 01:19 PM)Aventus45 Wrote: Shannon, is there an ETA for v2?
I'm estimating 1-2 days of work to optimize those script additions. And in spite of the desires of some, there will be no more script additions. I'm going to nail these down and build this damned thing. It's already gonna be challenging enough to get it all doing what it's supposed to do.
That said, V2 is showing consistently in the models as being several times more powerful and effective than V1 is.
Understandable. Based on this journal, V2 is going to be an absolute beast of a program.
Phase 1: The Foundation
AM6(2020)
LTU v6(2020-2021)
OF v3(2021)
Phase 2
AM6 Refresher + SM3(2021)
AM6(2020)
LTU v6(2020-2021)
OF v3(2021)
Phase 2
AM6 Refresher + SM3(2021)