I am planning my next program and I was really interested into BASE but then MLS released and with all these positive feedback I thought to go with MLS and then BASE.
However BASE includes MLS, the previous version (2.0 - 5G if I am correct).
I was wondering, is it better to go for MLS first and then BASE or am I covered and will save time with the MLS module in BASE?
However BASE includes MLS, the previous version (2.0 - 5G if I am correct).
I was wondering, is it better to go for MLS first and then BASE or am I covered and will save time with the MLS module in BASE?