05-11-2014, 12:34 AM
Thanks for info, I updated the spreadsheet.
Subliminal Talk
by Indigo Mind Labs
05-11-2014, 12:34 AM
Thanks for info, I updated the spreadsheet.
05-11-2014, 10:35 AM
Hi maniac360, here are two questions I'm asking myself about your spreadsheet:
Thank you very much
05-11-2014, 11:39 AM
Good question, I'm glad you asked them because It's some of the problem I faced myself when I created this.
1) I didn't put 33 days , the row number doesn't equal the day number because the first row is for the column's title. I didn't find a way to remove this "problem". 2)It doesn't matter, it's all up to you, both way will work. Pick the one that make more sense to you. I chose the first one.
05-11-2014, 11:58 AM
Thanks for your answers, this help me a lot
05-13-2014, 08:19 AM
I can but I would have to change the code to send the mails and I don't want calculate all the things again. Maybe it's just a small thing but I'm not in the mood to check this.
05-13-2014, 08:36 AM
No problem, just a suggestion
05-27-2014, 11:08 PM
(This post was last modified: 05-27-2014, 11:11 PM by JackOfHearts.)
I made a mistake with the mail sender so I think it works for no one even myself and the stage number will not increment because of that.
I corrected the problem with the last version : https://docs.google.com/spreadsheets/d/1...lUtD8/edit -If your spreadsheet didn't work properly change the number in the red cells (the stage number) -If you want to keep the version 5 and and get the error corrected copy all the JavaScript code from the last version. Or you can copy your data in last version either way will work. I'll try to make a video tonight to explain all this if possible.
05-28-2014, 10:01 PM
(05-13-2014, 07:26 AM)sebastian Wrote:(05-11-2014, 11:39 AM)maniac360 Wrote: 1) I didn't put 33 days , the row number doesn't equal the day number because the first row is for the column's title. I didn't find a way to remove this "problem". I've done what you said, now everything is more clear, it was bothering so now it's gone :@. I'll upgrade to the new version when I'm sure everything is correct. and maybe upload a video if possible.
05-29-2014, 01:22 AM
(This post was last modified: 05-29-2014, 01:28 AM by JackOfHearts.)
I have upgraded to the new version and I think my old code was working too and I didn't make any mistake.
This little code is more tricky than I thought. It's hard to test the code because it's base on the current date which come from the Google server. But anyway I hope now it's working, I'll see . This upgraded version now come with a column which indicate the current day. It's the same link by the way: https://docs.google.com/spreadsheets/d/1...edit#gid=0 Some of you can tell me if the stage number has been incremented by one automatically? And has received the mail with the old version (version 5 and before)?
06-20-2014, 03:45 AM
(This post was last modified: 06-20-2014, 04:04 AM by JackOfHearts.)
I'm pretty sure now the mail sender works.
So I made another version, the last hopefully and I made 2 video to describe how to use my new spreadsheet. Here is the link to the video: http://youtu.be/6w-Q_2PYnpw http://youtu.be/tUmHt4mnk_M Here is the link to the spreadsheet (it's the same link): https://docs.google.com/spreadsheets/d/1...edit#gid=0 |
|
Possibly Related Threads… | |||||
Thread | Author | Replies | Views | Last Post | |
LTU 6 Stage 4 | Raz | 1 | 3,859 |
11-08-2020, 02:31 PM Last Post: Benjamin |
|
AM5.0 stage 1 missing from store | Artemis | 2 | 3,903 |
04-06-2014, 10:57 AM Last Post: Artemis |
|
program-wise Testimonials or Threads | ssh | 2 | 3,312 |
09-22-2013, 08:36 AM Last Post: AlphaScorpio |