05-27-2014, 11:08 PM
(This post was last modified: 05-27-2014, 11:11 PM by JackOfHearts.)
I made a mistake with the mail sender so I think it works for no one even myself and the stage number will not increment because of that.
I corrected the problem with the last version :
https://docs.google.com/spreadsheets/d/1...lUtD8/edit
-If your spreadsheet didn't work properly change the number in the red cells (the stage number)
-If you want to keep the version 5 and and get the error corrected copy all the JavaScript code from the last version. Or you can copy your data in last version either way will work.
I'll try to make a video tonight to explain all this if possible.
I corrected the problem with the last version :
https://docs.google.com/spreadsheets/d/1...lUtD8/edit
-If your spreadsheet didn't work properly change the number in the red cells (the stage number)
-If you want to keep the version 5 and and get the error corrected copy all the JavaScript code from the last version. Or you can copy your data in last version either way will work.
I'll try to make a video tonight to explain all this if possible.