09-18-2018, 07:26 AM
update 2 of day 2:
time is 6.23pm
I ate and procrastinated or was just lazy but then got back into gear!! swapped the wall planner which wasnt easy as sticky tac (stick rubber to stick things to walls) took forever to remove, clean and reapply.
New planner is up on the wall and eventually I can fill in my uni time table and years schedule to it and get more organised.
I wont lie, I have been horny since I got back and doubt this is UMOP but ill mention it incase its relevant to this sub as it was to DMSI lol
Now im drinking a hot herbal tea for my throat which is sore, and also had a chat with 3 friends and will now plan to have a shower, and then aim to get into bed by 8.30pm if I can.
time is 6.23pm
I ate and procrastinated or was just lazy but then got back into gear!! swapped the wall planner which wasnt easy as sticky tac (stick rubber to stick things to walls) took forever to remove, clean and reapply.
New planner is up on the wall and eventually I can fill in my uni time table and years schedule to it and get more organised.
I wont lie, I have been horny since I got back and doubt this is UMOP but ill mention it incase its relevant to this sub as it was to DMSI lol
Now im drinking a hot herbal tea for my throat which is sore, and also had a chat with 3 friends and will now plan to have a shower, and then aim to get into bed by 8.30pm if I can.
OF3 5.75.7G 13/15Vol
1L-2O/3OF; (1L-2/2 5/6); (2L 19/6); (3L 27/6); (4L 9/7); (H4L 25/7)
W 19 May
MLS 5.5G: ≈70days x2, IYGSH: 54, E2: 78+48, DMSI 3.2: 56 & 22, UMOP1: 57+UMOP2: 33 = 90+10 US v12/15=100, OF: 45, OF2: 56days
1L-2O/3OF; (1L-2/2 5/6); (2L 19/6); (3L 27/6); (4L 9/7); (H4L 25/7)
W 19 May
MLS 5.5G: ≈70days x2, IYGSH: 54, E2: 78+48, DMSI 3.2: 56 & 22, UMOP1: 57+UMOP2: 33 = 90+10 US v12/15=100, OF: 45, OF2: 56days