Quote:Shannon Wrote:
DMSI 3.2-A Primary ASRB: 20 to 1
Secondary ASRB: 7 days on, 1 day off
What does this mean please?
and where will the link be posted for downloading A, for those of us that have bought 3.2 please?
thank you in advance.
OF3 5.75.7G 13/15Vol
1L-2O/3OF; (1L-2/2 5/6); (2L 19/6); (3L 27/6); (4L 9/7); (H4L 25/7)
W 19 May
MLS 5.5G: ≈70days x2, IYGSH: 54, E2: 78+48, DMSI 3.2: 56 & 22, UMOP1: 57+UMOP2: 33 = 90+10 US v12/15=100, OF: 45, OF2: 56days
1L-2O/3OF; (1L-2/2 5/6); (2L 19/6); (3L 27/6); (4L 9/7); (H4L 25/7)
W 19 May
MLS 5.5G: ≈70days x2, IYGSH: 54, E2: 78+48, DMSI 3.2: 56 & 22, UMOP1: 57+UMOP2: 33 = 90+10 US v12/15=100, OF: 45, OF2: 56days