Day 3- update 2:
Maintenance guy came and left.
Landlord came immediately after to take my bills that I am contesting im being overcharged for (see previous journal updates).
Something new happened, normally I would talk to the landlord and basically be a polite chump and wait for him to leave irrespective of how much time he spent. This time eventually I realised the conversation is going no where until he makes the relevant enquiries for me so I told him I had shit to do and need to get going. This could be UMOP but I liked it whatever it was!!
I since have had my first meal of the day and watched some more big bang theory.
My energy levels are still low, im tired and sleepy and dont understand why.
I hope its not a pre-diabetic slurge/slump of some kind but rather hope its simply me resisting the sub lol
Anyway I have to get myself moving again and get on with things so will do that now and see what happens....
Maintenance guy came and left.
Landlord came immediately after to take my bills that I am contesting im being overcharged for (see previous journal updates).
Something new happened, normally I would talk to the landlord and basically be a polite chump and wait for him to leave irrespective of how much time he spent. This time eventually I realised the conversation is going no where until he makes the relevant enquiries for me so I told him I had shit to do and need to get going. This could be UMOP but I liked it whatever it was!!
I since have had my first meal of the day and watched some more big bang theory.
My energy levels are still low, im tired and sleepy and dont understand why.
I hope its not a pre-diabetic slurge/slump of some kind but rather hope its simply me resisting the sub lol
Anyway I have to get myself moving again and get on with things so will do that now and see what happens....
OF3 5.75.7G 13/15Vol
1L-2O/3OF; (1L-2/2 5/6); (2L 19/6); (3L 27/6); (4L 9/7); (H4L 25/7)
W 19 May
MLS 5.5G: ≈70days x2, IYGSH: 54, E2: 78+48, DMSI 3.2: 56 & 22, UMOP1: 57+UMOP2: 33 = 90+10 US v12/15=100, OF: 45, OF2: 56days
1L-2O/3OF; (1L-2/2 5/6); (2L 19/6); (3L 27/6); (4L 9/7); (H4L 25/7)
W 19 May
MLS 5.5G: ≈70days x2, IYGSH: 54, E2: 78+48, DMSI 3.2: 56 & 22, UMOP1: 57+UMOP2: 33 = 90+10 US v12/15=100, OF: 45, OF2: 56days