11-03-2018, 10:01 AM
(11-03-2018, 09:58 AM)SargeMaximus Wrote:(11-03-2018, 09:43 AM)RTBoss Wrote:(11-03-2018, 07:29 AM)THolt Wrote:(11-02-2018, 08:11 PM)SargeMaximus Wrote:Indeed. I doubt that the building of the sub will be started before 20 November. I hope I’m wrong though. Seems like there are always delays with everything the past couple years(11-02-2018, 07:08 PM)wolverine_i_am Wrote: Bad news for DMSI users.
Same shit happened before 3.2’s release iirc
It is what it is. Improvements and steps forward are being made. People are getting free upgrades.
Once the skeleton script is done, programs will fly out of the shoot in 6G.
Shannon doesn't have to keep people in the loop or update anyone about anything at all, but he does. He'd probably get less flak from people if he didn't.
If I were him, I wouldn't tell anyone anything, and you get what you get when you get it. Lucky for us, he's not (me).
None of this makes sense. The issue is delays, not updates from Shannon.
Shannon updates us all about what hes doing when hes doing it and thus also updates us about delays or the opposite.
Its not difficult to see from the trends as to when a sub may be due usually.
I said in May on Zane's thread of how I dont believe 3.3 would be out before Xmas. I could be wrong even now but im close.
The main thing is to get the right sub, whenever it comes out and to give Shannon as much data as we all can in preparation for that.
OF3 5.75.7G 13/15Vol
1L-2O/3OF; (1L-2/2 5/6); (2L 19/6); (3L 27/6); (4L 9/7); (H4L 25/7)
W 19 May
MLS 5.5G: ≈70days x2, IYGSH: 54, E2: 78+48, DMSI 3.2: 56 & 22, UMOP1: 57+UMOP2: 33 = 90+10 US v12/15=100, OF: 45, OF2: 56days
1L-2O/3OF; (1L-2/2 5/6); (2L 19/6); (3L 27/6); (4L 9/7); (H4L 25/7)
W 19 May
MLS 5.5G: ≈70days x2, IYGSH: 54, E2: 78+48, DMSI 3.2: 56 & 22, UMOP1: 57+UMOP2: 33 = 90+10 US v12/15=100, OF: 45, OF2: 56days