09-10-2014, 07:57 PM
(09-10-2014, 05:50 PM)lokko Wrote: Hmm okay so the "Master key script" in 6 stage subs is what makes it possible for you to convert a 3g/4g script into 5g in under a day. While single stage subs that are 3g/4g subs to convert to 5g take way longer because there isn't a "master key script" for them right? this question was just out of my curiousity.
I don't think we're on the same page. It takes weeks and months to create and convert the MKS of a six stage set to 5G and get it ready.
3/4g subs converted to 5G take a tay or two because 5G format requires an exponential amount of time to generate according to the length of the script, plus we have stage key script weave-out and other things that a six stage set must have done that a single stage program does not require.
Both single stage and multi-stage have a master key script. But it's not called that for a single stage program because it is also simultaneously the stage key script, whereas for a multi-stage script, the stage key script must be extracted from the MKS for each stage.
Basically, it all boils down to how long the script is in 5G. If it was a 100k script for a single stage program, it would still take 2-3 months to build.
Subliminal Audio Specialist & Administrator
The scientist has a question to find an answer for. The pseudo-scientist has an answer to find a question for. ~ "Failure is the path of least persistence." - Chinese Fortune Cookie ~ Logic left. Emotion right. But thinking, straight ahead. ~ Sperate supra omnia in valorem. (The value of trust is above all else.) ~ Meowsomeness!
The scientist has a question to find an answer for. The pseudo-scientist has an answer to find a question for. ~ "Failure is the path of least persistence." - Chinese Fortune Cookie ~ Logic left. Emotion right. But thinking, straight ahead. ~ Sperate supra omnia in valorem. (The value of trust is above all else.) ~ Meowsomeness!