Shannon's Journal, Volume 3 - Printable Version +- Subliminal Talk (https://subliminal-talk.com) +-- Forum: Men's Journals (18+ NSFW) (https://subliminal-talk.com/Forum-Men-s-Journals-18-NSFW) +--- Forum: Men's Journals (https://subliminal-talk.com/Forum-Men-s-Journals) +--- Thread: Shannon's Journal, Volume 3 (/Thread-Shannon-s-Journal-Volume-3) |
RE: Shannon's Journal, Volume 3 - Shannon - 11-09-2024 Work on upgrading the 6G-Alpha skeleton script to the 6G-Beta skeleton script is officially underway. Right now I'm in Phase 1, the optimization phase. There will also be Phase 2, during which I strip out everything that isn't necessary anymore. Once that's done, I'll be doing Phase 3, which is adding the final scripting additions that will make it into 6G. I estimate this should require about 2 weeks to do. Once it's done, I'll start working on building the 6G-Beta test title, and then we'll start working on testing that. Testing is going to require between 1 and 3 months, depending on how this goes. I suspect it will probably be on the shorter end of that time frame. RE: Shannon's Journal, Volume 3 - Shannon - 11-09-2024 The Optimus Engine being upgraded to v7.0, nice. RE: Shannon's Journal, Volume 3 - Shannon - 11-10-2024 Made some HUGE changes to the 6G-Alpha Skeleton Script today to develop it into the 6G-Beta skeleton script. This is getting interesting. RE: Shannon's Journal, Volume 3 - Shannon - 11-11-2024 I have determined that the volume of 4/15 on an Android cell phone through it's speakers, or 5/16 on an iPhone through it's speakers, or 8/30 on a Google phone with 30 clicks of volume, through it's speakers, is also very useful for SARM v2.1-B. RE: Shannon's Journal, Volume 3 - Shannon - 11-14-2024 This is what I have in mind to build next. The goal is something I can build quickly to minimize distraction from working on the 6G-Beta skeleton script. Option A) Aura of Love with DRS, as requested by Keith. Option B) DRS stand alone, upgraded to 5.11G Option C) A hormone optimizer. What do you guys think? RE: Shannon's Journal, Volume 3 - Shannon - 11-16-2024 Alright, so all the tasks to be done to develop the 6G-Beta skeleton script are completed but one, and that one is most likely going to require 1 to 3 months to finish. It just so happens that testing the Beta prototype is also going to most likely take 1-3 months. So... I'm going to freeze the skeleton script as 6G-Beta and build the test title and start testing it, and then finish optimizing the skeleton script while we test it. That should reveal anything left that needs to be adjusted when we are done testing, and then what's left should be the 6G Final skeleton script. Personally, I am of the opinion that I could publish 6G-Beta as Final and it would do extremely well as it is right now... but, I'm going to grind until it's all optimized, all the way, and it's the furthest I can push it. As much as I would love to stop now, I know that it would drive me crazy knowing I could have done more. So 6G-Beta is finished and we will begin the process of getting it ready for building, and then finish the test title key script, which I just remembered isn't finished yet. I'll build and distribute that to the testers who have agreed to test it, and then I'll start in on optimizing the skeleton script the rest of the way. When that's finished, we should have 6G-Final. It's not coming as quickly as I'd like, but it's getting done, and it's being done right. It will be worth the wait, and the extra effort. |